6 days ago
Mumbai Local Services Disrupted By Bhandup Point Failure
A railway signal problem happened at Bhandup station on Thursday morning.
The problem affected trains travelling on the Up line toward Mumbai.
It involved a signal called S23.
Railway staff noticed the failure at 7:47 am.
They used an authorised marker to help manage train movements safely.
The fault was fixed at 8:35 am.
This means the disruption lasted 48 minutes.
The incident caused inconvenience during a very busy travel period.
Normal railway operations resumed after the repair.
A point failure at Bhandup station disrupted Central Railway Up services during Thursday morning’s peak period.
The failure affected Up line signal S23 and was reported at 7:47 am.
Railway officials said the fault was rectified at 8:35 am, after 48 minutes.
Up local trains were operated using an authorised marker while staff managed movements.
The disruption inconvenienced commuters travelling towards Mumbai and was followed by restored normal operations.
- Who
- Central Railway railway officials, staff, and commuters using Up local services.
- What
- A point failure at Bhandup station affected Up line signal S23 and disrupted train movements.
- Where
- Bhandup station on Mumbai’s Central Railway suburban network.
- When
- Thursday morning; the failure was reported at 7:47 am and rectified at 8:35 am.
- Why
- A point failure interfered with the functioning of the Up line signal during the morning peak.
Key facts
- Railway network
- Central Railway suburban network
- Location
- Bhandup station
- Affected service
- Up local trains travelling towards Mumbai
- Affected signal
- Up line signal S23
- Failure reported
- 7:47 am
- Fault rectified
- 8:35 am
- Duration
- 48 minutes










