1 week ago
GHMC Removes 74.8 MT Waste During Monsoon Drive
The Greater Hyderabad Municipal Corporation is running a special cleaning campaign in Hyderabad.
The campaign lasts 10 days, from August 11 to 21.
On its eighth day, workers removed 74.8 metric tonnes of waste.
They also fixed potholes and cleaned places where rainwater flows.
Workers started three rainwater-harvesting structures and checked seven public toilets.
Officials held awareness programmes in schools, shops, and communities.
Health teams sprayed areas to help control pests and took measures involving stray dogs.
The drive also included cleaning parks and supporting women’s self-help groups.
Officials said the work will help the city handle the continuing monsoon.
GHMC removed 53.40 MT of legacy municipal solid waste and 21.40 MT of construction and demolition waste on Day 8.
Teams filled 24 potholes, cleaned 29 catch pits, cleared three culverts, and removed 5 MT of floating material and silt.
Three rainwater-harvesting structures were initiated, while seven public toilets were inspected and 43 commercial bins installed.
Awareness, health, and environmental efforts included school programmes, pyrethrum spraying, stray-dog measures, and park waste removal.
The 10-day drive, running from August 11 to 21, aims to improve cleanliness and monsoon preparedness across Hyderabad.
- Who
- The Greater Hyderabad Municipal Corporation and its civic, sanitation, health, veterinary, and environmental teams.
- What
- A special monsoon drive removed 74.8 MT of waste and carried out sanitation, drainage, infrastructure, awareness, and welfare activities.
- Where
- Across Hyderabad.
- When
- The drive is being conducted from August 11 to 21; the reported activities took place on Day 8.
- Why
- To keep roads, drains, and public spaces clean and strengthen the city’s preparedness for the continuing monsoon.
Key facts
- Drive duration
- August 11 to 21, covering 10 days
- Waste removed on Day 8
- 53.40 MT of legacy municipal solid waste and 21.40 MT of construction and demolition waste
- Drainage work
- 24 potholes filled, 29 catch pits cleaned, and three culverts cleared
- Additional clearing
- 5 MT of floating material and silt removed
- Public facilities
- Seven public toilets inspected and 43 commercial bins installed
- Awareness and health
- IEC and training programmes in 13 schools reached 785 participants; pyrethrum spraying occurred at 167 locations
- Park waste
- 16.20 MT of pruned tree branches and 2.2 MT of dry and green waste lifted from 19 parks










