3 weeks ago

Kolkata Metro North-South corridor services disrupted by signalling breach

Kolkata Metro North-South corridor services disrupted by signalling breach
Kolkata metro services hit by signalling network breach between Noapara and Baranagar stations · telegraphindia.com

Kolkata is a big city in India with its own train system called the Kolkata Metro.

On Tuesday, one part of the metro's signalling system—the system that tells trains when to stop and go—stopped working.

The problem happened between two stations called Noapara and Baranagar on the North-South line.

Workers noticed the fault while doing a regular inspection.

They fixed the problem in stages to keep passengers safe.

Early in the morning, between 6 am and 6.30 am, trains only ran on a short stretch of the line.

Later, workers turned off power on part of the track, a move called a power block, so repairs could be done safely.

During that time, trains ran only between Noapara and Shaheed Khudiram stations.

By 4.08 pm, the signalling system was working again and normal train service returned.

Key facts

Operator
Kolkata Metro
Corridor
North-South
Affected section
Noapara–Baranagar stations
Cause
Signalling network breach detected during routine inspection
Service regulation
Girish Park to Shaheed Khudiram, 6 am–6.30 am
Power block
Dakshineswar to Noapara
Truncated services
Noapara to Shaheed Khudiram
Normal service resumed
4.08 pm (Dakshineswar to Shaheed Khudiram)

Sources

Related news