2 weeks ago
Fadnavis inaugurates key Mumbai infra projects to boost mobility, connectivity
A very important leader named Devendra Fadnavis, who is the Chief Minister of Maharashtra in India, switched on some brand-new roads and a train station in Mumbai.
Mumbai is a very big, busy city with lots of people and cars.
The new roads and station are meant to help people travel faster and avoid getting stuck in traffic.
He opened the projects using a video call from the Sahyadri Guest House in south Mumbai.
One of the new things is a station called Chembur on a new metro train line.
Special machines called tunnel boring machines, including one named Arjuna, will dig big tunnels so cars can go quickly between Thane and Borivali.
When the tunnels are finished, a trip that used to take more than an hour will only take around 15 minutes.
New air-conditioned trains for Mumbai commuters are also coming, with the first ones expected by 2027.
Chief Minister Devendra Fadnavis inaugurated the final BKC-Vakola arm of the Santacruz-Chembur Link Road (SCLR) Phase-2 via video link from the Sahyadri Guest House.
He also inaugurated the Chembur Metro station on Metro Line 2B and an elevated connector in the G-Block area of BKC.
Fadnavis launched 'Arjuna', the second tunnel boring machine for the Thane-Borivali twin-tunnel road project, after the first TBM 'Nayak' was launched in April.
The Thane-Borivali twin tunnels are expected to cut travel time between the two areas from about 60-90 minutes to around 12-15 minutes.
Under the Mumbai Urban Transport Project (MUTP), 238 new AC suburban trains were approved, with the first batch expected by 2027 and all trains by 2029-30.
- Who
- Devendra Fadnavis, Chief Minister of Maharashtra, with Deputy Chief Minister Sunetra Pawar and others present.
- What
- Inauguration of the final BKC-Vakola arm of SCLR Phase-2, the Chembur Metro station, a BKC G-Block elevated connector, and the launch of the second TBM 'Arjuna'.
- Where
- Mumbai, inaugurated via video link from the Sahyadri Guest House in south Mumbai.
- When
- Thursday, August 13.
- Why
- To improve mobility and connectivity and ease traffic congestion in the Mumbai metropolitan region.
Key facts
- Chief Minister
- Devendra Fadnavis
- Key projects
- Final BKC-Vakola arm of SCLR Phase-2, Chembur Metro station (Line 2B), BKC G-Block elevated connector
- TBM launched
- Arjuna (second TBM; first was Nayak, launched in April)
- Thane-Borivali travel time
- From about 60-90 minutes to around 12-15 minutes
- New AC suburban trains
- 238 train sets under MUTP; first batch by 2027, all by 2029-30
- Implementing agency
- MMRDA and other agencies
- BKC connectivity links
- Six planned in 2017-18; eight created, with the last inaugurated Thursday
- Facility named after
- Former Maharashtra chief minister Babasaheb Bhosale
Quotes
Devendra Fadnavis
Chief Minister of Maharashtra
“"The objective is to provide Mumbai commuters with a modern, metro-like suburban rail system," he said.”
theprint.in










