1 hr ago

Airlines Resist Mandatory International Flight Shift to Navi Mumbai

Airlines Resist Mandatory International Flight Shift to Navi Mumbai
Airlines push back against forced shift of international flights to Navi Mumbai · CNBC TV 18

Airlines are being asked to move some international flights from Mumbai Airport to the new Navi Mumbai Airport.

The airlines do not want the move to be compulsory.

They say each airline should decide after checking whether Navi Mumbai works well for its business and operations.

They are also worried about schedules, passengers, aircraft and airport slots.

The International Air Transport Association has asked the aviation ministry for more information.

Mumbai International Airport Ltd says Terminal 1 must be rebuilt and cannot wait any longer.

It says airlines can move to Navi Mumbai from October 25 or temporarily stop those operations.

The rebuilt Terminal 1 is expected to be ready in 2029-30, and MIAL says airlines will keep their old slot rights.

Key facts

Airline position
IATA wants the move to Navi Mumbai to be voluntary.
Airport operator
Mumbai International Airport Ltd operates Mumbai Airport.
Proposed start date
Airlines are to choose between moving operations or temporarily suspending them from October 25.
Terminal 1 timeline
The redeveloped Terminal 1 at Mumbai Airport is expected to be commissioned in 2029-30.
Historic slots
MIAL says airlines’ historic Mumbai Airport slot rights will be retained and honoured after Terminal 1 reopens.
Earlier construction plan
Terminal 1 demolition was originally planned for mid-2025 but was postponed because no alternative facility was available.

Sources

Related news