Politics · Indonesia · 2 hrs ago
Airport train service is set to extend from Bogor on December 1
KAI Commuter plans to extend the Soekarno-Hatta Airport train to Bogor, giving passengers a new rail route to the airport.
The service is scheduled to start on December 1, 2026, if operating and service permits are approved.
Trains are expected to stop at Bogor, Depok Baru and Manggarai before continuing through BNI City, Duri, Rawa Buaya and Batuceper to the airport.
The trip from Bogor is expected to take about 106 minutes.
The planned promotional fare is Rp 85,000, with limited seats and no standing passengers.
Shorter trips from Bogor or Depok to Manggarai or BNI City are expected to cost Rp 35,000 to Rp 45,000, while the regular fare is still being reviewed.
The extension follows strong interest from Bogor and Depok residents, and the company hopes permits will arrive in time for the planned launch.
PT KAI Commuter is targeting December 1, 2026, to begin extending the Soekarno-Hatta Airport train service to Bogor.
The proposed Bogor-to-airport journey is expected to take about 106 minutes.
The train is expected to stop at Bogor, Depok Baru and Manggarai before continuing on the existing route to the airport.
A promotional fare of Rp 85,000 is planned for trips from Bogor to the airport, with limited seats.
The extension still requires operating and service permits from the Directorate General of Railways.
- Who
- PT KAI Commuter is planning the extension. Its operational director and marketing director, Heri Siswanto, described the plan.
- What
- The Soekarno-Hatta Airport train service is set to extend to Bogor.
- When
- The target start date is December 1, 2026.
- Where
- The proposed route runs from Bogor to Soekarno-Hatta Airport, stopping at stations including Depok Baru and Manggarai.
- Why
- The company said a survey found strong interest among people in Bogor and Depok in transport to the airport.
This story does not have two clearly opposing sides.
Heri Siswanto outlined the planned route, fares and target start date at a KAI Commuter event in Jakarta.
PT KAI Commuter is targeting this date to begin the extension, subject to permits being issued.
- Target start date
- December 1, 2026
- Journey time
- About 106 minutes from Bogor to Soekarno-Hatta Airport
- Promotional fare
- Rp 85,000, with limited seats
- Planned stops
- Bogor, Depok Baru, Manggarai, BNI City, Duri, Rawa Buaya and Batuceper
- Required permits
- Operating and service permits from the Directorate General of Railways
What people are saying
For the fare from December 1, we still have a promotion at Rp 85,000. But seats are limited; there is no standing, everyone has to pay.
We are currently processing the operating and service permits at the Directorate General of Railways. Hopefully, once they are issued, this will coincide with the 2026 GAPEKA schedule, which is December 1.