World · South & Central Asia · 1 hr ago
Oruç Reis arrives in Pakistan for second overseas mission
Türkiye’s Oruç Reis vessel has arrived in Karachi for its second overseas mission.
The ship will work at two locations in Pakistan’s territorial waters, collecting seismic data used in hydrocarbon exploration.
It is set to gather 3D data across 670 square kilometres and 2D data across 2,353 square kilometres.
This follows its first overseas mission in Somalia, which lasted nine months.
The work brings Türkiye and Pakistan together in offshore exploration as Türkiye seeks to build on its deep-sea exploration experience.
The first project near Karachi is expected to take about 50 days, after which the ship will return to port before beginning a second project expected to take 25 days.
Türkiye’s seismic research vessel Oruç Reis has arrived and docked at Karachi port for its second overseas mission.
The vessel will collect 3D seismic data over 670 square kilometers and 2D seismic data over 2,353 kilometers in two locations in Pakistani waters.
Energy and Natural Resources Minister Alparslan Bayraktar is due to attend a ceremony in Pakistan on Friday.
The mission follows Oruç Reis’s first intercontinental assignment, which lasted nine months in Somalia.
- Who
- Türkiye’s Oruç Reis seismic research vessel, with Energy and Natural Resources Minister Alparslan Bayraktar due to attend a ceremony.
- What
- The vessel arrived in Pakistan for its second overseas mission and will collect 2D and 3D seismic data.
- When
- It arrived on November 19, 2026. It departed on October 30.
- Where
- Karachi port and two designated locations in Pakistani territorial waters.
- Why
- To conduct seismic data collection as part of hydrocarbon exploration in Pakistan’s waters.
This story does not have two clearly opposing sides.
Oruç Reis departed after completing preparations at Taşucu Port in Mersin.
The vessel arrived in Pakistan and docked at Karachi port.
A ceremony was planned in Pakistan, with Energy and Natural Resources Minister Alparslan Bayraktar due to attend.
- 3D data
- 670 square kilometers
- 2D data
- 2,353 kilometers
- First Pakistan project
- Marjan 3D seismic project in the Indus-C Block
- Second Pakistan project
- Makran 2D seismic project in the Makran Blocks
- Planned durations
- About 50 days for the first project and 25 days for the second
3 sources
What people are saying
As a country with the world’s 4th largest deep-sea drilling fleet, we aim to transform the deep-sea exploration expertise we have gained into new achievements by joining forces with our brotherly and friendly nation, Pakistan.
Through this operation, our ship, representing our nation's steadfast determination for energy independence, will once again showcase our country's strength and Turkish engineering to the entire world.