World · Latin America · 5 hrs ago
Mexico City airport stages earthquake and gas leak drill with nearly 2,000 volunteers
On Nov.
21, Mexico City International Airport held a full-scale emergency drill at Terminal 1, involving a simulated earthquake and an LP gas leak.
The exercise covered the terminal roof and the area around its shops.
Nearly 2,000 volunteers and airport workers took part, alongside staff from several public agencies and emergency services.
Participants practised taking shelter, protecting themselves, evacuating to safer areas and controlling the gas leak.
Afterward, teams inspected buildings and airport areas, while officials checked runways and aircraft stands; they found no damage.
Flights continued without interruption during the exercise.
The airport said the drill was intended to strengthen emergency response and help protect passengers and staff in a real crisis.
Mexico City International Airport conducted a full-scale emergency drill on November 21 involving an earthquake and an LP gas leak.
The simulated gas leak was on the roof of Terminal 1 and in the commercial area.
Nearly 2,000 volunteers and representatives of airport institutions took part.
The exercise included emergency-response, sheltering, self-protection and evacuation procedures, as well as controlling the simulated leak.
Airport operations continued without interruption, and inspections found no damage.
- Who
- Mexico City International Airport, with nearly 2,000 volunteers and representatives of airport institutions.
- What
- A full-scale drill simulating an earthquake and an LP gas leak.
- When
- November 21; the article was published on November 22, 2026.
- Where
- Terminal 1 and the commercial area of Mexico City International Airport.
- Why
- To strengthen emergency preparedness and assess the airport’s response capacity.
This story does not have two clearly opposing sides.
The airport conducted the full-scale earthquake and gas-leak drill.
Operational staff and emergency brigades inspected airport buildings and facilities, while airport teams checked runways and platforms; they confirmed there was no damage.
- Date
- November 21
- Participants
- Nearly 2,000 volunteers
- Simulated hazards
- Earthquake and LP gas leak
- Location
- Terminal 1 roof and commercial area
- Flight operations
- Continued without interruption