World · East Asia & Pacific · 49 mins ago
Gunsan secures ₩247 billion for flood upgrades in Impi district
Gunsan, South Korea, will upgrade drainage in its flood-prone Impi district after the area was selected for a national sewer-improvement program.
Impi is one of 11 areas chosen nationwide after applications and on-site inspections.
The project will cost ₩411 billion, with ₩247 billion coming from the national government and the rest from provincial and city funds.
Plans call for upgrading or adding 3.84 kilometres of stormwater pipes and building a pump station.
The work is intended to reduce flooding during periods of heavy rain.
Gunsan says it will move ahead with the project; the sources do not give a construction schedule.
Gunsan has secured ₩24.7 billion in national funding for flood-prevention upgrades in the Impi drainage district.
The district in Wolha-ri, Impi-myeon, was named a 2026 priority area for sewer-system improvements.
The project will cost ₩41.1 billion, with national, provincial and city governments funding 60%, 20% and 20%, respectively.
The city plans to upgrade or build 3.84 kilometres of stormwater pipes and construct a new rainwater pumping station.
- Who
- Gunsan City and the Ministry of Climate, Energy and Environment.
- What
- Impi drainage district was selected as a 2026 priority area for sewer-system improvements, securing ₩24.7 billion in national funding.
- When
- The selection was announced on November 19, 2026.
- Where
- The Impi drainage district in Wolha-ri, Impi-myeon, Gunsan, South Korea.
- Why
- To reduce flood risk in an area that is repeatedly flooded, including during periods of heavy rain.
This story does not have two clearly opposing sides.
The ministry invited applications from local governments nationwide and carried out site inspections and a comprehensive evaluation.
Gunsan announced that the Impi drainage district had been selected and that it had secured ₩24.7 billion in national funding.
- National funding
- ₩24.7 billion
- Total project cost
- ₩41.1 billion
- Project area
- 0.23 square kilometres
- Stormwater pipes
- 3.84 kilometres to be upgraded or newly built
- Pumping station
- One new rainwater pumping station
1 source
What people are saying
We will move the project forward quickly so that we can expand flood-prevention infrastructure from the old downtown area to rural areas and allow residents to live without worry.