Politics · Turkey · 15 hrs ago
Boyabat bypass opens, cutting peak crossing time from 20 minutes to five
Turkey opened an 8.7-kilometre bypass in Boyabat, a town in Sinop province.
The road cuts the crossing time during busy periods from 20 minutes to five minutes.
Boyabat is a junction for roads linking Sinop with Samsun, Kastamonu and Çorum, and its town centre carried heavy local and through traffic.
The bypass separates through traffic from town traffic and is expected to reduce congestion, noise and air pollution while improving road and pedestrian safety.
Officials estimate it will save 434 million lira a year and cut carbon emissions by 2,500 tonnes annually.
The government says the route will also improve travel and freight links between the Black Sea region and Central Anatolia, and the Türkeli town crossing is due to open next.
Turkey opened the 8.7-kilometre Boyabat bypass in Sinop province.
The road cuts the crossing time during peak hours from as long as 20 minutes to five minutes.
Transport and Infrastructure Minister Abdulkadir Uraloğlu said the project is expected to save 434 million lira a year.
The bypass diverts through traffic away from Boyabat town centre, separating it from local traffic.
The project is also expected to reduce congestion, noise and exhaust pollution and improve road and pedestrian safety.
- Who
- Turkey’s Transport and Infrastructure Minister Abdulkadir Uraloğlu opened the bypass.
- What
- The 8.7-kilometre Boyabat bypass opened. It cuts peak crossing time from as long as 20 minutes to five.
- When
- 28 November 2026.
- Where
- Boyabat, in Sinop province, Turkey.
- Why
- To take transit traffic out of the town centre and ease congestion. The project is expected to improve safety and reduce travel time and pollution.
This story does not have two clearly opposing sides.
This story does not have a timeline yet.
- Length
- 8.7 kilometres
- Peak crossing time
- Reduced from as long as 20 minutes to five minutes
- Annual savings
- 434 million lira
- Annual carbon reduction
- 2,500 tonnes
- Opening
- 28 November 2026