Business · Companies · 4 hrs ago
379 homes planned at Wang-suk HanShin The Hue Centum in Namyangju
A 379-home public housing project is being offered this month in the Wang-suk district of Namyangju, South Korea.
Called Wang-suk HanShin The Hue Centum, it will have four buildings and homes of 59 square metres.
The project is part of Wang-suk, a large planned new urban district, and is being developed by LH and a HanShin Engineering & Construction consortium.
Buyers will not face LH buyback or profit-sharing requirements if they later sell their homes.
A planned station nearby is expected to serve GTX-B, an extension of Seoul subway Line 9, and the existing Gyeongchun Line.
The GTX-B and Line 9 extension are both being pursued for opening in 2031, while the homes are scheduled for completion in July 2029.
Nearby plans include an industrial complex intended to attract companies in fields such as biotechnology, AI and information technology, with the city aiming to bring in companies by 2032.
LH and a Hanshin Engineering & Construction consortium plan to offer 379 homes at Wang-suk HanShin The Hue Centum in Namyangju this month.
The development will have four buildings, with homes measuring 59 square metres, and is scheduled for completion in July 2029.
The site is near the planned Wang-suk Station, where GTX-B, an extension of Seoul Subway Line 9 and the existing Gyeongchun Line are planned to stop.
The project is a public sale, and its developers say future resale will not require LH buyback or profit-sharing.
The nearby Wang-suk urban high-tech industrial complex passed a regional planning committee review in September.
- Who
- LH and a Hanshin Engineering & Construction consortium are supplying the homes.
- What
- A 379-home public apartment development is planned.
- When
- The homes are due to be offered in November 2026. Move-in is scheduled for July 2029.
- Where
- Block A-17 in the Wang-suk district of Namyangju, Gyeonggi Province, South Korea.
- Why
- Not stated
This story does not have two clearly opposing sides.
The nearby Wang-suk urban high-tech industrial complex passed a review by the Ministry of Land, Infrastructure and Transport’s Metropolitan Area Readjustment Committee.
LH and the Hanshin consortium plan to offer the homes.
The development is scheduled for move-in.
The planned opening target for GTX-B and the Gangdong-Hanam-Namyangju Line.
Namyangju plans to attract businesses to the industrial complex by this year.
- Homes
- 379
- Home size
- 59 square metres
- Buildings
- 4, up to 29 floors
- Site
- Block A-17, Wang-suk district, Namyangju
- Scheduled move-in
- July 2029
- Industrial complex
- 1.2 million square metres, planned investment of about 1.8334 trillion won