Business · Companies · 15 hrs ago
Turkey adds 577 machines and equipment for winter road work
Turkey’s Transport and Infrastructure Minister, Abdulkadir Uraloğlu, said the highway authority added 577 machines and equipment for the 2026–2027 winter season.
The purchases cost 2.135 billion lira, and 80% came from domestic sources.
They include trucks fitted with snowplough blades and salt spreaders, excavators and other road-maintenance equipment.
The authority says its fleet’s average age has fallen to 9.9 years, from 18 in 2002.
This matters because crews must keep roads safe and open during snow and ice; the ministry says preparations are complete.
Some 14,303 staff will work across 68,540 kilometres of roads, supported by 457 snow-response centres and 13,256 machines and equipment.
Crews have stored salt and other materials, and some vehicles will be monitored by cameras and tracking systems.
Turkey’s General Directorate of Highways added 577 machines and pieces of equipment to its fleet in 2026 for road maintenance and winter operations.
The equipment cost 2.135 billion lira, and 80% of the purchases came from domestic sources.
Transport and Infrastructure Minister Abdulkadir Uraloğlu said preparations for the 2026-2027 winter season were complete.
Snow and ice work will cover a 68,540-kilometre road network, using 13,256 machines and equipment and 14,303 personnel.
The ministry said its fleet has 15,335 machines and pieces of equipment, including 5,818 mobile units.
- Who
- Turkey’s General Directorate of Highways, under Transport and Infrastructure Minister Abdulkadir Uraloğlu.
- What
- It added 577 machines and pieces of equipment to its fleet for road maintenance and winter operations.
- When
- In 2026, ahead of the 2026-2027 winter season.
- Where
- Turkey, across a 68,540-kilometre road network.
- Why
- To strengthen road maintenance capacity and prepare for snow and ice, keeping roads safe and open.
This story does not have two clearly opposing sides.
Turkey’s General Directorate of Highways acquired 577 machines and pieces of equipment for 2.135 billion lira.
Uraloğlu spoke at a ceremony launching the 2026-2027 snow and ice season and putting road-maintenance vehicles into service.
Snow and ice operations are planned across 68,540 kilometres of roads, with 14,303 personnel.
- New equipment
- 577 machines and pieces of equipment
- Purchase cost
- 2.135 billion lira
- Domestic sourcing
- 80% of purchases
- Winter road network
- 68,540 kilometres
- Winter operations workforce
- 14,303 personnel
2 sources
What people are saying
Vatandaşlarımız müsterih olsunlar: Kış hazırlıklarımız tamamlanmıştır.
Bugün itibarıyla Karayollarımız, 5 bin 818'i hareketli olmak üzere toplam 15 bin 335 makine ve ekipmanla hizmet vermektedir.