Archive · 30 Dec 2025
Hennur–Bagalur Road Partially Closed for 3 Months
A part of the Hennur–Bagalur Road in Bengaluru will be closed for 3 months.
The Greater Bengaluru Authority is doing some road work called white topping.
During this time, big trucks and heavy vehicles won't be allowed on this road.
This is to make sure the work is done safely and quickly.
The closed part is from the railway crossing near Vaddarapalya Rajakaluve to Faran College.
People should find other routes to travel during this time.
Hennur–Bagalur Road partially closed for 3 months for white topping work.
Greater Bengaluru Authority is carrying out the work.
Heavy vehicles will not be allowed on this stretch during the closure.
Closure affects the section from the railway crossing near Vaddarapalya Rajakaluve to Faran College.
Aim is to ensure smoother execution of the project and public safety.
- Who
- Greater Bengaluru Authority
- What
- Partial closure of Hennur–Bagalur Road for white topping work
- When
- For 3 months
- Where
- Stretch from the railway crossing near Vaddarapalya Rajakaluve to Faran College
- Why
- To ensure smoother execution of the project and public safety
- Road
- Hennur–Bagalur Road
- Closure Duration
- 3 months
- Work Type
- White topping work
- Restricted Vehicles
- Heavy vehicles
- Authority
- Greater Bengaluru Authority
- Closure Stretch
- Railway crossing near Vaddarapalya Rajakaluve to Faran College