Archive · 10 Dec 2025
NTPC Green Energy Starts 6.6 MW Wind Power Supply in Gujarat
NTPC Green Energy, a part of the big power company NTPC, has started giving electricity from a wind power project in Gujarat.
This project is part of a bigger 100 MW hybrid project.
They have started supplying 6.6 MW of power, which is a small part of the whole project.
This addition increases their total power capacity to 7645.675 MW.
The project is located in Bhuj, Gujarat, and this news was announced on a Wednesday, but the exact date wasn't mentioned.
NTPC Green Energy begins commercial power supply of 6.6 MW wind project in Bhuj, Gujarat.
The project is part of a larger 100 MW hybrid project.
This addition increases NTPC Green Energy's total capacity to 7645.675 MW.
The announcement was made by NTPC on Wednesday.
The specific date of the announcement was not mentioned.
- Who
- NTPC Green Energy
- What
- Started commercial power supply of 6.6 MW wind project
- When
- Wednesday (specific date not mentioned)
- Where
- Bhuj, Gujarat
- Why
- Part of a 100 MW hybrid project
- Company
- NTPC Green Energy
- Project Location
- Bhuj, Gujarat
- Project Capacity
- 100 MW hybrid
- Commercial Supply Started
- 6.6 MW (Wind)
- Total Capacity After Addition
- 7645.675 MW