Archive · 29 Jan 2026

1,098-tonne Bullet Train Bridge Completed in Ahmedabad

1,098-tonne Bullet Train Bridge Completed in Ahmedabad

Engineers have finished building a very big and strong steel bridge in Ahmedabad for the Mumbai–Ahmedabad Bullet train.

This bridge is special because it was made to protect a metro tunnel underneath it.

The bridge is 100 metres long and weighs 1,098 tonnes.

It was made in Maharashtra and then brought to Ahmedabad.

The bridge is part of India's first high-speed train project and helps keep the train safe as it goes through the city.

The bridge is very strong and was built using special bolts and paint to make it last a long time.

Sources