Archive · 28 Jul 2025
Green Light for Madh-Versova Bridge: Faster Travel for Mumbai
Mumbai is getting a new bridge to make it super easy to travel between Madh Island and Versova!
Right now, it takes a long time, like an hour and a half, but this new bridge will make it just a quick 10-minute trip.
The bridge will cost a lot of money, about 2,395 crore, and will take about three years to build.
It will have four lanes for cars and will help people avoid traffic and get to Madh Island's beaches and fun places much faster.
The BMC has received environmental clearance for the Madh-Versova cable-stayed bridge.
The bridge will connect Madh Island to Versova, reducing travel time significantly.
The project is estimated to cost Rs 2,395 crore and is expected to be completed in 2028.
The bridge will be 27.5 meters wide, with four lanes.
The structure will minimize ecological damage to mangroves.
- Who
- Brihanmumbai Municipal Corporation (BMC).
- What
- Construction of a cable-stayed bridge connecting Madh Island and Versova.
- When
- Proposed 10 years ago; expected completion around 2028.
- Where
- Connecting Madh Island and Versova in Mumbai.
- Why
- To reduce travel time and ease traffic congestion.
Environmental Concerns (Unstated)
BMC's Stance (Implied)
Environmental Impact
Environmental Concerns (Unstated)
Unstated
BMC's Stance (Implied)
Unstated
- Project
- Madh-Versova Cable-Stayed Bridge
- Location
- Mumbai
- Estimated Cost
- Rs 2,395 crore
- Travel Time Reduction
- From 90 minutes to 5 minutes
- Bridge Width
- 27.5 meters
- Construction Time
- 3 years
Sources
10 years on, Centre clears proposal for cable-stayed flyover between Mumbai’s Madh Island and Versova
Mumbai Now Maximum Metro City: How Many Lines Are Running On Which Routes? How Many More To Go?
Centre clears proposal for cable-stayed flyover between Madh Island and Versova
Inspired by South Korea, BMC to install 25 floodgates along Mithi River for Rs 2,300 crore to prevent flooding