Archive · 3 Oct 2025
Falaknuma Road Overbridge Opens to Ease Traffic
A new bridge in Falaknuma, Hyderabad, has opened!
It's designed to help traffic move faster between Barkas Junction, Falaknuma depot, and other areas.
The bridge is 360 meters long and has four lanes.
The project cost over 52 crore rupees and was completed by GHMC and South-Central Railways.
It will make it easier for people to travel, saving time for commuters and tourists.
The parallel road overbridge (ROB) at Falaknuma was launched to ease traffic.
The bridge is 360 meters long with four lanes.
The project was completed by GHMC and South-Central Railways.
The project cost ₹52.03 crore.
The inauguration was attended by the Transport Minister and other officials.
- Who
- Ponnam Prabhakar, Asaduddin Owasi, GHMC officials
- What
- Opening of the Falaknuma Road Overbridge
- When
- Friday
- Where
- Falaknuma, Hyderabad
- Why
- To ease traffic congestion and improve traffic flow
Pre-existing Bottleneck
Relief for Commuters
Traffic Congestion
Pre-existing Bottleneck
The old bridge was a major traffic bottleneck due to increased vehicle movement.
Relief for Commuters
The new bridge will ease traffic congestion and streamline traffic flow.
- Project
- Falaknuma Road Overbridge (ROB)
- Inaugurators
- Transport Minister Ponnam Prabhakar, MP Asaduddin Owaisi, GHMC officials
- Location
- Falaknuma, Hyderabad
- Cost
- ₹52.03 crore
- Length
- 360 meters
- Lanes
- Four
- Completed by
- GHMC and South-Central Railways