Archive · 29 Jul 2026

India Wasted 11% Solar Power Amid Summer Demand

India Wasted 11% Solar Power Amid Summer Demand

During the hot summer months in India, the country's power grid couldn't handle all the solar energy being produced.

This led to about 11% of the solar power being wasted.

The grid had to shut down some solar power generators to keep the system stable and prevent blackouts.

This happened because the power lines and other infrastructure couldn't keep up with the rapid growth of solar and wind energy.

The government is trying to fix this by making coal plants work more flexibly and by investing in better grid infrastructure.

India aims to greatly increase its clean energy capacity by 2030 and 2036.

Sources