Archive · 23 Jul 2026
Madgaon Railway Station Platforms 1-3 Closed for Maintenance
Madgaon Railway Station will close Platforms 1, 2, and 3 for five hours on July 24 to dismantle the old Foot Over Bridge.
Trains will use Platforms 4, 5, and 6 during this time.
Passengers should arrive early and check platform details to avoid confusion.
This work is part of ongoing upgrades to improve safety and facilities at the station.
Madgaon Railway Station will close Platforms 1, 2, and 3 from 12:50 PM to 5:50 PM on July 24.
Trains will be handled from Platforms 4, 5, and 6 during the block period.
The closure is for dismantling the existing Foot Over Bridge (FOB) as part of station infrastructure upgrades.
Passengers are advised to reach the station early and verify platform details.
Railway officials have made arrangements to minimize disruption to train services.
- Who
- Konkan Railway
- What
- Five-hour traffic and power block for infrastructure upgrades
- When
- July 24, 12:50 PM to 5:50 PM
- Where
- Madgaon Railway Station
- Why
- To dismantle the existing Foot Over Bridge (FOB) and improve station facilities
Passenger Convenience
Infrastructure Upgrades
Passenger Experience
Passenger Convenience
Passengers may face inconvenience due to platform changes and need to reach the station early.
Infrastructure Upgrades
The maintenance is necessary for improving passenger safety and station facilities.
- Date
- July 24
- Time
- 12:50 PM to 5:50 PM
- Closed Platforms
- 1, 2, 3
- Operational Platforms
- 4, 5, 6
- Reason
- Dismantling of existing Foot Over Bridge (FOB)