Archive · 10 Aug 2025
Mumbai Central Railway Undertakes Traffic Blocks for Infrastructure Upgrades
Mumbai's train lines, particularly the Central Railway, had to pause services for some maintenance.
On the Harbour line, they were fixing the signals at Vashi, which caused some trains to change routes.
Also, they were pouring concrete for a road bridge on another line.
At night, they worked on a bridge near Kalyan.
These changes mean trains might have been delayed, but it's all to make the train system better.
Central Railway conducted special traffic blocks for infrastructure upgrades.
A block at Vashi station on the Harbour line was in place for electronic interlocking work.
Special services ran between CSMT and Mankhurd during the Vashi block.
A Trans-Harbour line block occurred between Thane and Turbhe for a ROB slab casting.
Overnight girder work happened between Kalyan, Ambarnath, and Badlapur.
- Who
- Commuters using the Central Railway lines.
- What
- Temporary suspensions of train services for infrastructure upgrades and maintenance.
- When
- Sunday.
- Where
- Mumbai, specifically on the Central Railway's Harbour and Trans-Harbour lines.
- Why
- To commission electronic interlocking, cast a road overbridge slab, and conduct girder works.
- Affected Railway
- Central Railway
- Harbour Line Block Location
- Vashi station
- Harbour Line Block Time
- 12:45 am to 10:45 am
- Trans-Harbour Line Block
- Thane and Turbhe
- Trans-Harbour Line Block Time
- 12:30 am to 5:30 am
- Girder Work Location
- Kalyan, Ambarnath, Badlapur