Archive · 21 Jun 2025
Chennai Metro Orange Line Construction Progress and Details
Imagine a new train line in Chennai, called the Orange Line!
It's like building a long road just for trains, going from Poonamallee Bypass to Lighthouse.
This new line is about 26 kilometers long and has many stops, some underground and some above ground.
It's going to make it easier and faster for people to travel around Chennai.
The cost to ride will be similar to the other trains, costing between 10 and 50 rupees.
The trains should run often, especially during busy times, and the service will be available from early in the morning until late at night.
The Chennai Metro Orange Line (Line 4) is under construction, connecting Poonamallee Bypass to Lighthouse.
The Orange Line will be approximately 26.1 km long, featuring 28 stations.
Stations will include 10 underground and 18 elevated stops.
Fares are expected to be similar to existing metro lines, with a minimum of Rs 10 and a maximum of Rs 50.
Operating hours are anticipated to be from 4:30 AM to 11:00 PM, with trains every 4-5 minutes during peak times.
- Who
- The rapid transit system of Chennai.
- What
- The construction of the Chennai Metro Orange Line (Line 4).
- When
- Under construction.
- Where
- Chennai, India, connecting Poonamallee Bypass to Lighthouse.
- Why
- To improve east-west connectivity, reduce travel time, and ease traffic congestion.
- Line Name
- Chennai Metro Orange Line (Line 4)
- Route
- Poonamallee Bypass to Lighthouse
- Length
- Approx. 26.1 km
- Stations
- 28 (10 underground, 18 elevated)
- Minimum Fare
- Rs 10
- Maximum Fare
- Rs 50
- Operating Hours
- 4:30 AM to 11:00 PM
- Peak Hour Frequency
- Every 4–5 minutes