Archive · 22 Jun 2025
Mumbai-Ahmedabad Bullet Train: Darotha River Bridge Completed
Imagine a super-fast train that will travel between Mumbai and Ahmedabad!
A new bridge has just been finished over a river in Gujarat, which is a big step for this train project.
The bridge is like a super-strong road, and it is 80 meters long!
It's built with special parts and is very tall, about 18 meters high.
This train will travel at very high speeds, and it will get you to your destination much faster than it takes now.
This project shows how India is building impressive infrastructure and is taking care of the environment while doing so.
Bridge construction completed over Darotha River in Gujarat for Mumbai-Ahmedabad Bullet Train.
The bridge spans 80 meters and is between Boisar and Vapi stations.
It features two 40-meter Steel Box Segment girders supported by a 5-meter diameter pier.
The project reflects India's infrastructure capabilities and adherence to quality standards.
Once operational, the train will connect Mumbai and Ahmedabad in under three hours.
- Who
- The National High-Speed Rail Corporation Limited (NHSRCL) is overseeing the project.
- What
- Completion of a bridge for the Mumbai-Ahmedabad Bullet Train.
- When
- Not explicitly stated, but the news is from June 2025.
- Where
- Over the Darotha River in Gujarat, between Boisar and Vapi stations.
- Why
- To advance the Mumbai-Ahmedabad Bullet Train project and reduce travel time between the cities.
- Project
- Mumbai-Ahmedabad Bullet Train
- Bridge Location
- Darotha River, Gujarat
- Bridge Length
- 80 meters
- Pier Diameter
- 5 meters
- Bridge Height
- 18 meters
- Technology
- Japanese Shinkansen
- Cities Connected
- Mumbai and Ahmedabad