Archive · 15 Nov 2025
Panvel Municipal Corporation Accelerates Road Repairs Across All Zones
The city of Panvel is fixing its roads really fast!
The people in charge, called the Panvel Municipal Corporation, are making sure roads in all the different neighborhoods, like Kharghar, Panvel, Kalamboli, and Kamothe, get repaired quickly.
A top official is even visiting the work sites to check on the progress and make sure the work is good.
They are sending engineers to each area to watch over the repairs.
They want to fix the roads as fast as possible, like soldiers preparing for a mission, to make it easier for everyone to travel.
Lots of places are being worked on right now, and they promise to fix all the roads that need it.
Panvel Municipal Corporation has intensified its road repair drive across all four zones: Kharghar, Panvel, Kalamboli, and Kamothe.
Additional Commissioner Ganesh Shete conducted an on-site inspection in Kharghar, directing officials to ensure quality and timely completion of repairs.
Junior engineers are deployed in each zone to supervise roadworks under the guidance of senior engineering officials.
Repairs are being carried out on a 'war footing' to minimize inconvenience to residents.
Ongoing roadwork is happening in multiple locations including Kalamboli, Roadpali, Kharghar, Kopra Bridge, and New Panvel.
- Who
- Panvel Municipal Corporation (PMC) led by Additional Commissioner Ganesh Shete, with City Engineer Sanjay Katekar and Executive Engineer Sudhir Sanlukhe overseeing the operations.
- What
- Accelerated road repair works are being conducted across all four zones of the municipality, with on-site inspections and quality checks underway.
- When
- The intensified drive is currently ongoing, with specific inspections happening on Thursday, and repairs being carried out on a 'war footing'.
- Where
- Across all four zones of Panvel Municipal Corporation: Kharghar, Panvel, Kalamboli, and Kamothe, with specific focus on areas like Kharghar Sector 13, Kalamboli Sector 13, Roadpali Sector 16E, and others.
- Why
- To address road issues, minimize inconvenience to residents, and ensure repairs meet quality standards and timelines.
Panvel Municipal Corporation (PMC)
Citizens/Residents
Road Repair Urgency
Panvel Municipal Corporation (PMC)
Road repairs are being conducted on a 'war footing' to minimize citizen inconvenience and ensure quality and timely completion.
Citizens/Residents
Citizens are experiencing inconvenience due to ongoing roadworks, highlighting the need for efficient and rapid completion.
Supervision and Quality Control
Panvel Municipal Corporation (PMC)
Junior engineers are deployed in each zone, supervised by senior engineers, to ensure quality standards are met during repairs.
Citizens/Residents
The effectiveness and thoroughness of the quality control measures are paramount to ensure long-lasting repairs.
- Implementing Body
- Panvel Municipal Corporation (PMC)
- Action
- Accelerated road repair drive
- Zones Covered
- Kharghar, Panvel, Kalamboli, and Kamothe
- Inspection Focus
- Road stretch from White Temple to Signal junction in Kharghar’s Sector 13
- Key Personnel
- Additional Commissioner Ganesh Shete, City Engineer Sanjay Katekar, Executive Engineer Sudhir Sanlukhe
- Current Locations
- Kalamboli Sector 13, Roadpali Sector 16E, Kharghar Sector 34, Kopra Bridge, Kamdhenu Sector 13, Golf Course area, New Panvel
Sources
Panvel Municipal Corporation Clears ₹48.40 Crore Gadhi River Bridge Project To Ease Traffic Congestion On Panvel–Karanjade Stretch
Navale bridge accident: Authorities to set up check post, emergency service centre on accident prone stretch