Archive · 2 Jun 2025
Mumbai Metro Line 3 Phase 2A Opens, Connecting BKC to Worli
Imagine a new train line in Mumbai called Metro Line 3!
A part of it, called Phase 2A, just opened, connecting BKC (a big business area) to Worli.
This new part is like a tunnel under the Mithi river and has six stops.
Trains will run from early morning to late at night, making it easier to get to work in places like Worli.
The ride will take about 15-20 minutes from BKC to Worli, and it will cost between 10 to 40 rupees.
This is part of a bigger plan to make it simpler for people to travel around the city.
Mumbai Metro Line 3 phase 2A from BKC to Worli opened on May 10th.
The Aqua Line extension is 9.77 km long, featuring six stations.
Trains operate from 6:30 AM to 10:30 PM, and from 8:30 AM on Sundays.
The minimum fare is ₹10, and the maximum fare is ₹40 for this phase.
Travel time between BKC and Acharya Atre Chowk is 15-20 minutes.
- Who
- The Mumbai Metro Line 3 is now partially operational.
- What
- Phase 2A of Mumbai Metro Line 3, an extension of the Aqua Line, has opened.
- When
- Phase 2A opened on May 10th. The final phase is expected in August.
- Where
- The new line runs from Bandra-Kurla Complex (BKC) to Acharya Atre Chowk in Worli, Mumbai.
- Why
- To provide metro connectivity to offices in Worli, Lower Parel, and Prabhadevi from BKC.
- Opening Date
- May 10th
- Length of Phase 2A
- 9.77 km
- Number of Stations
- Six
- Fare Range
- ₹10 - ₹40
- Travel Time (BKC to Acharya Atre Chowk)
- 15-20 minutes
- Operating Hours
- 6:30 AM - 10:30 PM (except Sundays)
- Travel Time (JVRL Aarey to Acharya Atre Chowk)
- 36 minutes