Archive · 19 Dec 2025
GMADA Allots Rs 3.8 Crore for Basement Waterproofing
The Greater Mohali Area Development Authority (GMADA) has decided to spend Rs 3.5 crore to fix a big problem in Purab Premium Apartments.
The apartments in Sector 88, Mohali, have been having issues with water leaking into their basements for a long time.
GMADA will now do special waterproofing work above the basement to stop the leaks.
This work will be done in the areas near Blocks A, B, C, and D. After the necessary paperwork and choosing the right people to do the job, GMADA plans to finish the work in about four months.
This should finally give the residents some relief from their water problems.
GMADA allocates Rs 3.5 crore for waterproofing work in Purab Premium Apartments.
The project aims to address persistent basement water seepage issues.
Work will be carried out above the basement slab in the power area adjoining Blocks A, B, C, and D.
The tender process will be completed before work begins, with a target completion time of four months.
Residents of the apartment complex have been facing water seepage problems for a long time.
- Who
- Greater Mohali Area Development Authority (GMADA) and residents of Purab Premium Apartments
- What
- Allocation of Rs 3.5 crore for basement waterproofing
- When
- Tender process to be completed before work begins; targeted completion in 4 months
- Where
- Purab Premium Apartments, Sector 88, Mohali
- Why
- To address persistent basement water seepage issues
- Location
- Purab Premium Apartments, Sector 88, Mohali
- Issue
- Basement water seepage
- Allocated Funds
- Rs 3.5 crore
- Scope of Work
- Waterproofing above basement slab in power area
- Affected Blocks
- A, B, C, D
- Project Duration
- 4 months (target)