Archive · 14 Dec 2025
Ashoka Buildcon JV Wins Mumbai Flyover Project
Ashoka Buildcon and Aakshya Infra Projects have teamed up to build a big bridge in Mumbai.
The city government gave them the job, and they have to finish it in about two years.
The bridge will connect two other bridges and make it easier for people to get around.
The project costs over ₹1,000 crore, and Ashoka Buildcon is the main partner in this team.
Ashoka Buildcon's joint venture with Aakshya Infra wins BMC flyover project worth ₹1,041.44 crore.
Flyover will connect J.J. Bridge and Sitaram Selam Bridge in Mumbai's 'E' Ward.
Project to be completed within 24 months, excluding monsoon period, on an EPC basis.
Ashoka Buildcon holds 51% stake in the joint venture, with Aakshya Infra owning the remaining 49%.
Trading window for designated persons and their immediate relatives closed until 48 hours after disclosure.
- Who
- Ashoka Buildcon and Aakshya Infra Projects Private Limited (Joint Venture)
- What
- Construction of a flyover connecting J.J. Bridge and Sitaram Selam Bridge
- When
- Project to be completed within 24 months (excluding monsoon period)
- Where
- J.J. Road and Saboo Siddik Polytechnic Road, 'E' Ward, Mumbai
- Why
- Awarded by Brihanmumbai Municipal Corporation (BMC) for infrastructure development
- Project Value
- ₹1,041.44 crore (inclusive of GST)
- Project Duration
- 24 months (excluding monsoon period)
- Contract Type
- EPC (Engineering, Procurement, and Construction)
- Joint Venture Stakeholders
- Ashoka Buildcon (51%), Aakshya Infra (49%)
- Project Location
- J.J. Road and Saboo Siddik Polytechnic Road, 'E' Ward, Mumbai