Archive · 3 Jun 2025
KMDA Upgrades Infrastructure and Amenities at Rabindra Sarobar Lake
Imagine a park around a big lake.
The city is fixing things up there!
They're putting in new supports to keep the lake banks from crumbling.
They are also improving the pipes that drain water when it rains.
The pathways are getting fixed too, so they're easier to walk on.
Finally, they are building a new bathroom for everyone to use.
All the work should be finished soon, making the park even better.
KMDA is enhancing infrastructure and amenities at Rabindra Sarobar Lake.
Bullah piling is underway to protect lake banks from erosion.
Stormwater drainage system near Tollygunge has been revamped.
Inner walkways are being renovated with new materials.
A new toilet block is being constructed near Menoka Gate.
- Who
- Kolkata Metropolitan Development Authority (KMDA).
- What
- KMDA is enhancing infrastructure at Rabindra Sarobar Lake.
- When
- Work is expected to be completed by the end of the month.
- Where
- Rabindra Sarobar Lake, Kolkata.
- Why
- To protect the lake banks, improve drainage, and renovate walkways.
- Authority
- Kolkata Metropolitan Development Authority (KMDA)
- Location
- Rabindra Sarobar Lake, Kolkata
- Lake Area
- 72 acres
- Bullah Piling Status
- 80% complete
- Walkway Renovation
- 1 km re-laid, 800m remaining
- Drainage Improvement
- 1.5 km of new lines
- Completion Estimate
- End of the month