Archive · 1 Sep 2025
Ahmedabad's Shastri Bridge Lane Closed for Structural Inspection
Imagine a bridge that helps people get from one side of a city to the other.
This bridge, called Shastri Bridge, is going to have a checkup.
One of the lanes, the one going from Pirana Circle to Vishala Circle, will be closed for 10 days in September, from 11 in the morning until 5 in the afternoon.
This is so the engineers can look closely at the bridge and make sure it's strong and safe.
While the checkup happens, only the left side of the bridge will be closed so traffic can continue to flow on the other side.
A lane on Ahmedabad's Shastri Bridge will be closed for a structural inspection.
The closure will affect the left side of the bridge heading from Pirana Circle.
The inspection will take place from September 1 to September 10.
Closure hours will be between 11 am and 5 pm.
The Executive Engineer will conduct the inspection.
- Who
- Executive Engineer of the National Highway Division
- What
- Structural inspection of the Shastri Bridge
- When
- September 1 to September 10, between 11 am and 5 pm
- Where
- Shastri Bridge, Ahmedabad
- Why
- To conduct a detailed structural inspection
- Bridge Name
- Shastri Bridge
- Location
- Ahmedabad, connecting Pirana Circle to Vishala Circle
- Closure Duration
- 10 days
- Closure Dates
- September 1 to 10
- Closure Time
- 11 am to 5 pm
- Reason for Closure
- Structural inspection