Archive · 24 May 2025
Patna Roads Under Repair Following Sewerage Work
Some roads in Patna are being fixed after the work on the sewer system was completed.
The roads are in Digha and Kankarbagh areas.
The repair work is being done by the Road Construction Department after BUIDCO handed them over.
The government wants the repairs done quickly, especially before the rainy season.
People living there are having a tough time because of dust and the bad roads.
The minister in charge has told everyone to fix all the roads by the end of May.
RCD is set to repair damaged roads in Patna.
BUIDCO handed over three major roads to RCD for urgent repair.
The roads are located in Digha and Kankarbagh zones.
Road Construction Minister directed repairs to be completed by May 30.
Residents face difficulties due to damaged roads and construction.
- Who
- Road Construction Department (RCD), Bihar Urban Infrastructure Development Corporation (BUIDCO)
- What
- Road repair works.
- When
- Directed to be completed by May 30.
- Where
- Patna, specifically Digha and Kankarbagh zones.
- Why
- To address damage from sewerage network work and prepare for monsoon season
- Repairing Authority
- RCD
- Handover from
- BUIDCO
- Affected Zones
- Digha and Kankarbagh
- Ministerial Directive
- Complete repairs by May 30