Business · Companies · 19 hrs ago
Tubacex restores full capacity at its Abu Dhabi plant
Spanish steel pipe maker Tubacex has restored full operations at its Abu Dhabi plant after conflict around the Strait of Hormuz disrupted its work and raw-material deliveries.
The factory, which opened in 2024 and has 150 employees, is now running at full capacity.
The disruption contributed to Tubacex’s €5.5 million loss in the first nine months of the year.
The Abu Dhabi plant supports a 10-year supply deal with Adnoc, the United Arab Emirates’ state energy company, covering 30,000 tonnes of pipe worth more than $1 billion.
Tubacex says contract terms guarantee payment deadlines for the order, which is halfway through its term.
The company also works with UAE investment fund Mubadala through a joint venture that makes and services pipes for energy projects.
Tubacex’s Abu Dhabi operation is a key part of this international production network, and its return to full capacity restores normal operations at the site.
Tubacex says its Abu Dhabi plant has returned to normal operations and is working at full capacity.
The plant’s operations and raw-material logistics were disrupted by the conflict in the Strait of Hormuz.
The disruption contributed to Tubacex’s €5.5 million losses from January to September 2026.
The Abu Dhabi facility opened in 2024 and has 150 employees.
- Who
- Tubacex, a manufacturer of seamless tubes, restored operations at its Abu Dhabi plant.
- What
- The plant is working at full capacity after disruptions to operations and raw-material logistics.
- When
- The restoration was reported on November 9, 2026. The sources do not state when full capacity was restored.
- Where
- Abu Dhabi, United Arab Emirates.
- Why
- Operations and raw-material logistics had been disrupted by the conflict in the Strait of Hormuz.
This story does not have two clearly opposing sides.
Tubacex’s Abu Dhabi plant was commissioned.
The disruption contributed to Tubacex’s losses of €5.5 million.
Tubacex took part in the Adipec energy industry event in Abu Dhabi.
Cinco Días reported that the Abu Dhabi plant was working at full capacity.
- Location
- Abu Dhabi, United Arab Emirates
- Workforce
- 150 employees
- Plant launch
- 2024
- Capacity status
- Full capacity
- Reported losses
- €5.5 million from January to September 2026
What people are saying
at full capacity