Business · Energy & Commodities · 1 hr ago
Perpetual defines a rare earth exploration target at Brazil’s Raptor project
Perpetual Resources has defined an initial rare earth exploration target at its Raptor project in Brazil’s Poços de Caldas district.
The target covers an estimated 20.9–31.9 million tonnes across the Portão Verde and Pina Colada prospects.
It is based on shallow drilling and geological modelling, and is not yet a mineral resource.
All 13 shallow holes at the two prospects ended in mineralised material, but the auger drilling reached only 12 metres.
The company plans deeper drilling, along with infill and step-out holes, to test how far the mineralisation extends and refine the estimated tonnage.
Laboratory tests confirmed ionic adsorption clay-style mineralisation, with initial tests showing up to 93.8% magnet rare earth extraction.
Rare earths such as neodymium and praseodymium are used in some electric vehicle motors and wind turbines, while dysprosium and terbium help magnets withstand high temperatures.
Further drilling and testing will help assess whether Raptor can support a first mineral resource estimate.
Perpetual Resources defined a maiden exploration target of 20.9–31.9 million tonnes at 2,581–2,612 parts per million total rare earth oxides at its Raptor project in Brazil.
The target covers the Portão Verde and Pina Colada prospects in the Poços de Caldas district.
All 13 shallow auger holes across the two prospects ended in mineralisation above the 1,000ppm cut-off used in the company’s model.
Perpetual is planning deeper and infill drilling to test the mineralisation’s extent and continuity.
Independent ANSTO testwork confirmed ionic adsorption clay-style mineralisation in Raptor samples.
- Who
- Perpetual Resources, an Australian company identified in the article as PEC.
- What
- It defined a maiden exploration target for rare earths at its Raptor project.
- When
- The article was published on November 16, 2026. The target’s definition date is not stated.
- Where
- The Raptor project, in Brazil’s Poços de Caldas district.
- Why
- To estimate the project’s potential scale and guide drilling to test the mineralisation and assess its potential for a maiden mineral resource.
This story does not have two clearly opposing sides.
Perpetual used shallow drilling and geological modelling to estimate the mineralised footprint.
Stockhead reported Perpetual’s maiden exploration target for Raptor.
Perpetual is designing deeper, infill and step-out drilling to test the mineralisation’s extent and continuity.
- Exploration target
- 20.9–31.9 million tonnes at 2,581–2,612ppm total rare earth oxides
- Prospects
- Portão Verde and Pina Colada
- Shallow drilling
- 13 auger holes across the two prospects, all ending in mineralisation
- Model cut-off
- 1,000ppm total rare earth oxides
- Auger depth limit
- 12 metres
- Testwork
- Initial, unoptimised magnet rare earth extraction reached 93.8% in laboratory tests
What people are saying
We are particularly encouraged by Portão Verde, where the target combines strong TREO and magnet rare earth grades with approximately 42ppm Dy+Tb oxide.
The next phase of drilling will be designed to test whether the mineralisation continues laterally and through the deeper weathered profile contemplated by the exploration target, while generating the data required to assess Raptor’s potential for a maiden mineral resource.